Lifeway has started a huge Modular Home Project in Glencoe, OK. Our customer bought a piece of land from the original “Land Rush” owner and has started the process of tearing down old structures and planning a new 2-Story Modular Home overlooking their pond. The home will be ground level from the front with an attached 2-car garage. On the backside of the low rolling hill will be a walk-out basement for a shop and workroom. The ground level home will have a walk-out deck.

The process began with dirt work by contractors to level and provide room for the 2400 sq. ft. basement. Stem walls were poured next, followed by the creation of the foam block wall. The foam block wall was filled with concrete with a pump station and 5 loads of cement purchased from Kerns Construction. The pump station truck was hired from Johnston Concrete Pumping in Stillwater, OK.

Kerns Concrete & Johnston Pumping Co.
Walkout Basement for Modular Home by Lifeway Homes

Walkout Basement Install